ONGOING PROJECTS
CLIENT |
NAME OF PROJECT |
|
BHP PETROLEUM |
Provision of laying 8" x 20KM Pipeline |
more |
BHP PETROLEUM |
Provision of laying Super Duplex 13% Crumium Special Steel Pipe 10" x 5.6KM |
more |
FOUNDATION POWER COMPANY |
20" Dia Gas Pipeline for 175 MW Combined Cycle Power Plant |
more |
PAKISTAN PETROLEUM LIMITED PPL |
Laying of 6" Dia High Pressure Buried Gas Pipeline |
more |
ENI Pakistan Limited |
Construction of 10" dia pipeline laying and associated works for 3 years at Kadanwari, Bhit, Badhra and any other block on call-out basis |
more |
BHP PETROLEUM |
Provision of Construction of Evaporation Ponds (Effluent waste Water System) |
more |
BHP PETROLEUM |
Provision of Zam - 1 Rehabilitation Work of access road. |
more |
BHP PETROLEUM |
Zam North Rectification Works |
more |
BHP PETROLEUM |
Indus Highway Pipeline Crossing Protective Works |
more |
ENGRO Fertilizers Ltd |
Construction of New 16" Dia Gas Line from Engro Fertilizers Ltd Plant site to Mari Gas Manifold-II |
more |
ENGRO Fertilizers Ltd |
Construction of 14" Effluent Piping from D2 to E1 Pond |
more |
Fotco Oil Terminal |
Construction of New Jetty (QP2) on Turnkey basis at Fotco Oil Terminal for Fauji Oil Terminal & Distribution Co. Ltd. |
more |
BHP PETROLEUM |
Water Disposal Well Flow Line and Tie- Ins Works at Zamzama, DADU Sindh |
more |
BHP PETROLEUM |
Underground Services of Water Disposal Well Facility at Zamzama, DADU, Sindh |
more |
BHP PETROLEUM |
Construction Services of PWTP Foundations at Zamzama, DADU, Sindh |
more |
PAK ARAB PIPELINE COMPANY LTD (PAPCO) |
Construction of White Oil Pipeline Horizontal Directional Drilling (HDD) at Begari Canal, Shahi-Patfeeder and NW Canal at Kashmor Kandh Kot and ShikarPur |
more |
FAUJI FERTILIZER COMPANY LTD (FFCL) |
Laying of Natural Gas Pipeline from D/S of Mari Gas Field Manifolds to FFC NG Line Compressor Station at Deh Shahbazpur, Daharki |
more |
CLIENT: BHP PETROLEUM (PAKISTAN) PTY LTDNAME OF PROJECT & LOCATION
Provision of laying 8" x 20KM Pipeline from Zamzama North Wellhead to Zamzama to BHP Gas
Processing Plant
PROJECT DESCRIPTION
- Fabrication, Installation & Commissioning of Duplex Steel Pipeline 8"dia beveled ends SMLS
W.T. 8.74mm, API 5LC (UNS S31803) Grade LC-65-2205 3L Polyproplyene Coated.
- Preparation of 10 to 15 meter wide ROW
- Supply of 50mm thick concrete coated line pipe as per relevant specs and drawings
- Trenching as per required depth and compaction of the trench bed by providing sieved sand
-Stringing, welding and 100% NDT
-Supply and installation of heat shrink sleeves for welding joints
-Holiday testing, Lowering, Backfilling compaction and ROW reinstatment
- Commissioning Complete
-Installation of DEHN SOHNE SURGE DIVERTOR TYPE 923-062
-CP WORKS: Installation of complete CP system including material, survey, Design Engg, Testing & Commissioning
-Welding of flanges on both ends of the flow line and tie-in with existing facility pipeing including hydro tightening
-Installation of pipeline in Zamzama Plant
-Supply and installation of the pipeline insulators, end seals (high strength resin type) for cased crossing
-Seven Numbers of cased pipe road crossing and Three Nos water courses by Open Ditch Thrust Bored
-Laying, termination, Splicing, testing etc of Fibre Optic Cable with accessories
-Hydro testing of flowline as per specification
CLIENT: BHP PETROLEUM (PAKISTAN) PTY LTD
NAME OF PROJECT & LOCATION
Provision of laying Super Duplex 13% Crumium Special Steel Pipe 10" x 5.6KM from Zam B&D Wellheads to
BHP Gas Processing Plant
PROJECT DESCRIPTION
- Fabrication, Installation & Commissioning of 13% Cr. Steel Pipeline from ZAM B&D Wellhead to BHP's Gas Processing Facilities
- Pipe 10" x 12.7 w.t Beveled Ends API 5LC 13% Cr
- Pipe 8" dia Bevelled Ends w.t 9.7mm API 5LC 13% Cr. SMLS, 3LPPolyethylene Coated
- Preparation of 10 to 20 meter wide ROW
- Loading & Transportation of 3L PP Line Pipe and facotry made hot induction bend to site
- Trenching as per required depth to attain the profile of the flow line as per drawing
- Stringing, welding and 100% NDT
- Supply and installation of heat shrink sleeves for welding joints
- Holiday testing, Lowering, Backfilling compaction and ROW reinstatment
- Installation of DEHN SOHNE SURGE DIVERTOR TYPE 923-062
- CP WORK: Installation of complete CP system including material, survey, Design Engg, Testing & Commissioning
- Welding of flanges on both ends of the flow line and tie-in with existing facility pipeing including hydro testing
- Installation of pipeline in Zamzama Plant
- Supply and installation of the pipeline insulators, end seals (high strength resin type) for cased crossing
- Seven Numbers of cased pipe road crossing and Three Nos water courses by Open Ditch Thrust Bored
- Laying, termination, Splicing, testing etc of Fibre Optic Cable with accessories
- Hydro testing of flow line as per specification
- Commissioning Complete
CLIENT: FOUNDATION POWER COMPANY LIMITED – DAHARKI
NAME OF PROJECT & LOCATION
20" Dia Gas Pipeline for 175 MW Combined Cycle Power Plant Daharki
VALUE OF WORK
Rs. 342 Million
PROJECT DESCRIPTION
-Design, Survey, Engineering, Supply of Material - 20 " dia API 5LX-60 spiral welded pipe with 3 layer PE Coating
-Procurement of valve, pipe fittings, heat shrink sleeves, metering system, bends
-Civil Works, Transportation, Construction on existing ROW
-Launcher / Receiver System, Cathodic Protection, NDT Inspections, Security, Pipeline Pigging
-Commissioning Complete
CLIENT:PAKISTAN PETROLEUM LIMITED PPL
PIDC House, Dr. Ziauddin Ahmed Road Karachi
NAME OF PROJECT & LOCATION
Laying of 6" Dia High Pressure Buried Gas Pipeline from ADAM X-1 Well, Hala to
SSGCL's Tie-in Point Near Goth, JORO DERO
PROJECT DESCRIPTION
Construction & laying of 6" Dia Gas Pipeline, work includes
- Preparing 30 ft wide right-of-way (ROW)
- Excavation of 3 feet wide and 3 feet deep trench mostly in water logged areas
- Transportation of line pipe from Hala stores to site, visual inspection, repairing. beveled ends, discarding the pipe length, if damage is extensive and beyond repair pipeline inspection, stringing, cleaning the inside, construction/welding section tie-ins of the pipeline using pneumatic internal line up clamp, installation welding of all pipe fittings in accordance with API 1104 as per specification.
- Lowering without stressing the pipeline in the trench after coat and wrap/heat shrinkable sleeves application on welded joints.
- Backfill free of stone, bushes, stumps, and any material which could be detrimenal to the coating of the pipeline
- Backfill with imported earth, if excavated earth is not suitable
- Fab. & installation of Pig Launcher/Receiver, bypass spools and construction of RCC supports.
- Valves and Fittings; fabrication/erection of fittings of various sizes incl. transportation, painting
- Supply and installation of heat shrink sleeves.
- Inertization of the laid pipeline
- Installation including design of crossovers
- Hydrotest of the entire pipeline as per BS 31.3 and API 1110 (1800 psig) and commissioning
CLIENT:ENI PAKISTAN LIMITED
5th Floor, The Forum, G-20, Block-9,
Khayaban – e - Jami, Clifton, Karachi
NAME OF PROJECT AND LOCATION
Construction of Pipeline Laying and Associated Works for
3 years at Kadanwari, Bhit, Badhra and any other block on call-out basis
PROJECT DESCRIPTION
EXHIBIT B-1 BHIT (KIRTHER AREA) & KADANWARI AREA
Mobilization of equipment/machinery, manpower & setting of temporary camp and other facilities as per project requirement.
CIVIL WORKS (FLOW LINE/PIPELINE)
. Supply & installation Flow line/Pipeline Markers
. Supply & install RCC cast in site barriers at road crossing in compliance with project specifications
• Supply, fabricate, construct/weld anchor flange and anchor blocks for the flow pipeline
• Construction of culverts at water channel crossings
• RCC slabs for heavy traffic passing
• Supply, fabricate & install Tie-in Pit for 24" Gathering and 10" Flow line
• FLOW LINE / PIPELINE INSTALLATION
• Cutting, filling, clearing trees and bush removing and grading as required of the pipeline ROW
• Excavation, line pipe end preparation, cutting beveling, welding, lowering & backfilling of Flow line / Pipeline 10", 12" dia SCH. 30S (22% Cr. Duplex SS) including preparation of field bends & 5D bends up to Tie-in point. Work complete with flanges, valves, fittings, Gaskets, insulating flange, vent, drain, painting of aboveground portion, 100% radiography, PT, Holiday test etc.
• Flow line/Pipeline 10", 12" dia (Carbon Steel API 5LX – 60, 9.30mm thick, Seamless/SAW Longitudinal seam& 17mm thick, SAW/ERW, Longitudinal. 5D bends up to Tie-in point. Work complete with flanges, valves, fittings, Gaskets, insulating flange, vent, drain, painting of aboveground portion, 100%radiography, PT, Holiday test etc.
• Flow line/Pipeline 24" dia (Carbon Steel API 5LX – 60, 12.7mm thick, Seamless/SAW Longitudinal seam 5D bends up to Tie-in point. Work complete with flanges, valves, fittings, Gaskets, insulating flange, vent, drain, painting of aboveground portion, 100%radiography, PT, Holiday test etc.
• HS Sleeves installation for 10", 12", 24" dia Flow line (CS/Duplex SS) Installation of heat shrink sleeve width 17" & 34" cross-link polyethylene RAYCLAD WPC – 120 (Tyco/Raychem).
• Hydrotesting, pigging, gauging & cleaning of Duplex Pipeline 10", 12" & 24" dia as per project specifications.
• Installation/welding of CP cleats/connection lugs/stub on gas Flow line/Pipeline.
• Installation & connecting of T/R Unit, Solar Power Supply Unit, Anode junction box on pre-fabricated mounted structure, test station on pre-fabricated steel support, 2 No's ground bed including excavation & backfilling
• Installation & connecting of cables partially laid in cable trenches
• Installation & connecting of potential monitoring equipment comprising of voltmeter 2 No's permacell reference electrode and PVC cable.
CLIENT:BHP PETROLEUM (PAKISTAN) PTY LTD
NAME OF PROJECT AND LOCATION
Provision of laying 8" x 20KM 22% Crumium Duplex Stainless Steel Pipeline from Zamzama North Wellhead to Zamzama to BHP Gas Processing Plant
PROJECT DESCRIPTION
• Fabrication, Installation & Commissioning of Duplex Steel Pipeline 8"dia beveled ends SMLS
• W.T. 8.74mm, API 5LC (UNS S31803) Grade LC-65-2205 3L Polyproplyene Coated.
• Preparation of 10 to 15 meter wide ROW
• Supply of 50mm thick concrete coated line pipe as per relevant specs and drawings
• Trenching as per required depth and compaction of the trench bed by providing sieved sand
• Stringing, welding and 100% NDT
• Supply and installation of heat shrink sleeves for welding joints
• Holiday testing, Lowering, Backfilling compaction and ROW reinstatment
• Commissioning Complete
• Installation of DEHN SOHNE
• CP WORKS: Installation of complete CP system including material, survey, Design Engg, Testing & Commissioning
• Welding of flanges on both ends of the flow line and tie-in with existing facility pipeing including
• hydro tightening
• Installation of pipeline in Zamzama Plant
• Supply and installation of the pipeline insulators, end seals (high strength resin type) for cased crossing
• Seven Numbers of cased pipe road crossing and Three Nos water courses by Open Ditch Thrust Bored
• Laying, termination, Splicing, testing etc of Fibre Optic Cable with accessories
CLIENT:BHP PETROLEUM (PAKISTAN) PTY LTD
NAME OF PROJECT AND LOCATION
Provision of laying Super Duplex 13% Crumium Special Steel Pipe 10" x 5.6KM from Zam B&D Wellheads to BHP Gas Processing Plant
PROJECT DESCRIPTION
Fabrication, Installation & Commissioning of 13% Cr. Steel Pipeline from ZAM B&D Wellhead to BHP's Gas Processing Facilities
• Pipe 10" x 12.7 w.t Beveled Ends API 5LC 13% Cr.
• Pipe 8" dia Bevelled Ends w.t 9.7mm API 5LC 13% Cr. SMLS, 3LPPolyethylene Coated
• Preparation of 10 to 20 meter wide ROW
• Loading & Transportation of 3L PP Line Pipe and facotry made hot induction bend to site
• Trenching as per required depth to attain the profile of the flow line as per drawing
• Stringing, welding and 100% NDT
• Supply and installation of heat shrink sleeves for welding joints
• Holiday testing, Lowering, Backfilling compaction and ROW reinstatment
• Installation of DEHN SOHNE SURGE DIVERTOR TYPE 923-062
• CP WORK: Installation of complete CP system including material, survey, Design Engg, Testing & Commissioning
• Welding of flanges on both ends of the flow line and tie-in with existing facility pipeing including hydro testing
• Installation of pipeline in Zamzama Plant
• Supply and installation of the pipeline insulators, end seals (high strength resin type) for cased crossing
• Seven Numbers of cased pipe road crossing and Three Nos water courses by Open Ditch Thrust Bored
• Laying, termination, Splicing, testing etc of Fibre Optic Cable with accessories
• Hydro testing of flowline as per specification
CLIENT: FOUNDATION POWER COMPANY LIMITED - DAHARKI
NAME OF PROJECT AND LOCATION
20" Dia Gas Pipeline for 175 MW Combined Cycle Power Plant Daharki
15KM long from Mari Deep Well to Power Station (near Mirpur Mathelo)
PROJECT DESCRIPTION
• Design, Survey, Engineering, Supply of Material - 20" dia API 5LX-52 spiral welded pipe
with 3 Layer PE Coating.
• Procurement of valve, pipe fittings, heat shrink sleeves, bends.
• Civil Works, Transportation, Construction on existing ROW.
• Launcher / Receiver System, NDT Inspections, Pipeline Pigging.
• Commissioning Complete.
• Cathodic Protection.
CLIENT: NIGERIAN GAS COMPANY LIMITED / SHAUKAT & RAZA (PVT) LTD.
Odin Road, Ekpan, P.M.B. 1288, Warri, Delta State. Nigeria, /
9th Floor, Rimpa Plaza, M. A. Jinnah Road, Karachi.
NAME OF PROJECT AND LOCATION
Re-Construction of Burnt Delta IV Metering Station, Ughelli-Nigeria
PROJECT DESCRIPTION
Part A. Design Engineering study & procurement services
Part B. Supply of imported material
• Supply of Gantry Crane, line break / ESTD valve, Material for repair of pressure
reduction system & metering skid , refurbishment of pig trap and 12" isolation full bore ball valve,
• Refurbishment parts of station outlet MOV (Motor Operated Valve) Instrument Gas skid, materials for Utility system,
• Telecommunication system, instrumentation & control system, CP Facility, fire detection and protection system. Supply of calorimeter, densitometer, materials for interconnecting piping, fittings etc.
• Supply of Valve, Valve actuators & relief valves.
• Supply of Control panel, UPS system complete.
Part C. Construction
• Re-construction of pipeline including installation of 12" (600 #) and 20"(300 #) insulating joints,
• Re-construction of Cathodic production system.
• Construction of complete Civil Infrastructures & Control building of the metering station including road, guardhouse etc.
• Construction of process facilities.
• Constriction of all utility systems.
• Construction of Electrical & Instrumentation of the metering station.
• Refurbishment & Reconstruction of pressure reduction skid, metering Skid & pig trap.
• Provision of site accommodation, messing and radio communication system
• Construction of station inlet 10" ESD / line break valve, Construction of instrument
gas system.
All field instrumentation and control system & integration with existing heaters,
• Filter separator & slop tank.
• Construction of Calorimeter, densitometer, control panel & UPS system
• Construction of all skid interconnecting piping, automatic flooding & fire extinguishing
• System (FM 200 / INERGEN)
• Utility system, instrumentation cabling and junction boxes, insulating joints, earthing system,
• Painting & reconstruction of existing roads.
• Dismantling of existing bypass facility and hooking up of newly installed facilities.
• Pre-commissioning & commissioning
CLIENT: PAK-ARAB REFINERY LIMITED
St-4/B, Block-14, Sir, Shah Suleman Road, Gulshan-e-Iqbal,
Karachi.
NAME OF PROJECT AND LOCATION
16" dia MFM Pipeline Crossing by HDD Method of Upper Gogera Branch
Canal at District Sheikhupura.
PROJECT DESCRIPTION
• Shifting all material from PARCO warehouse Sheikhupura to Machike Terminal Station, Sheikhupura including loading/unloading.
• Excavation, dewatering, welding of line pipe, bends and other fittings, hydrostatic testing & fabrication of spools.
• Cold cutting of existing 16" Ø pipeline for tie-in with new line, oil retrieval / collection from the pipeline before cold cut.
• Installation of 16" dia x 0.5" W.T. pipeline, 120M long, with a minimum of 3 meter curve under canal bed at RD 150+200 using Horizontal Directional Drilling Method
• Removal/dismantling of cut pipe spool, removal of piles & pile caps of existing overhead crossing
• Final tie-in, welding with existing underground oil pipeline, priming and coating of welded joints with heat shrink sleeves including tie-in joints, bends, pipe and fitting repairing.
CLIENT: SUI SOUTHERN GAS COMPANY LIMITED
ST-4/B, Block -14, Sir Shah Suleman Road, Gulshan -e- Iqbal
Karachi.
NAME OF PROJECT AND LOCATION
Installation of 16" & 20" diameter Submerged high pressure gas pipeline under canals/crossing.
Drilling System.
PROJECT DESCRIPTION
Installation of 16" & 20" dia high pressure steel gas pipeline under canal by Horizontal Directional Drilling System.
Contract No: SSGC/SC/TE-600/Cont-/2006
a. Rohri Canal Crossing MP 77+2100
• Transportation of 16 inch dia. Pipeline, bends and other material from SSGC stores at
Shikarpur to site and fabrication, welding and pre-testing the required crossing section of pipeline for HDD crossing.
• Drilling the horizontal directional, bore under the canal bed and installation of Pre-tested 16 inch dia. Pipeline crossing section with bends etc.
b. KP East Crossing MP 77+2800
• Transportation of 16 inch dia. Pipeline, bends and other material from SSGC stores at
Shikarpur to site and fabrication, welding and pre-testing the required crossing section of pipeline for HDD crossing.
• Excavation, dewatering, welding of line pipe, bends and other fittings, hydrostatic testing & fabrication of spools.
• Cold cutting of existing 16" Ø pipeline for tie-in with new line, oil retrieval / collection from the pipeline before cold cut.
• Installation of 16" dia x 0.5" W.T. pipeline, 120M long, with a minimum of 3 meter curve under canal bed at RD 150+200 using Horizontal Directional Drilling Method.
• Removal/dismantling of cu/t pipe spool, removal of piles & pile caps of existing overhead crossing.
• Final tie-in, welding with existing underground oil pipeline, priming and coating of welded joints with heat shrink sleeves including tie-in joints, bends, pipe and fitting repairing.
c. Begari Canal KM 70 + 781
• Transportation of 20 inch dia. Pipeline, bends and other material from SSGC stores at
Shikarpur to site and fabrication, welding and pre-testing the required crossing section of
pipeline for HDD crossing.
• Drilling the horizontal directional, bore under the canal bed and installation of Pre-tested
20 inch dia. Pipeline crossing section with bends etc.
CLIENT: ENGRO FERTILIZERS LIMITED
NAME OF PROJECT AND LOCATION
14" Cross Country Piping from D2 to E1 Pond at Daharki
PROJECT DESCRIPTION
• Welding, excavation, laying, coating wrapping on joints, holiday testing, backfilling, and restoration if excavated area for 14" CS, SCH. 20 pipeline from D2 to E1 pond.
• Road crossing (Open Cut)
• Road crossing (Thrust Bore Cut)
• Acquisition of land (width of land required 20ft)
• Design, procurement, Installation and commissioning of sacrificial type CP System
• Provide supports for above ground piping complete in all respect
• Provide anchore blocks and anchor flanges on line
• Hydrotesting of complete piping system
• Sandblasting, primer application and painting of above ground piping as per Efert standards
• Detailed engineering
CLIENT: ENGRO FERTILIZERS LIMITED
NAME OF PROJECT AND LOCATION
NEW 16" GAS PIPELINE PROJECT AT DAHARKI
PROJECT DESCRIPTION
• Survey and Pipe line locating: Installation pipeline markers on existing pipeline and locating temporary markers for New 16" dia Pipeline.
• Detailed engineering & Design
• Procurement / supply of B12 dia 3 Layer Polyethylene
• Fabrication, welding, stringing & laying of pipeline including excavation & dewatering etc
• providing and fixing anchor blocks, buoyancy weight
• Road and canal crossings thru Horizontal directional Drilling (HDD)
• Providing and installation of fittings, valves, heat shrink sleeves, insulating joints & insulating flange kits etc
• providing and installation of Pressure Relieve Valves and Gauges etc.
• NDT complete including hydrotesting & Pigging of Pipeline
• Providing & installation of Hot Tap tee 12" x 12" x 12" including Hot Tapping activity
• Providing and installation of Pig Launcher & Receiver complete including quick closure.
• Providing and installation of Cathodic Protection system
• Civil Work: trench weight, foundations, supports, pits & anchor etc
• Hydro testing and commissioning complete of flowline as per specification
CLIENT: BHP PETROLEUM
NAME OF PROJECT AND LOCATION
Provision of Construction of Evaporation Ponds (Expansion of Waste Water System) including the following activities
PROJECT DESCRIPTION
Excavation, earth filling of embankment with suitable material, compacted, sand filling on bed and inner slopes, bettar protection with 2" concrete, brick & grouting. Excavation of AG drains, providing and spreading of 10mm crushed stone. Providing and fixing of geo textile inside AG drains, providing and fixing of 90mm UPVC "slotted & plain" pipe including fittings. Construction of AG pits/valve pits including all civil works abd fixing of covers. Providing and fixing of 0.2mm thick polythene sheet below sand bedding and inside slopes of the E-ponds. Supply and welding HDPE pipe 200mm dia x 150M, supply of 12" steel pipes for thrust bore casing precoated, welding the 12" pipes and joint coating. Inserting the 200mm dia HDPE pipe & PVC conduit 300mm dia for electric cable including excavation and backfilling.
CLIENT: BHP PETROLEUM
NAME OF PROJECT AND LOCATION
Provision of Zam - 1 Rehabilitation Work
PROJECT DESCRIPTION
Work includes: Dewatering / repair ZAM 1. Providing and laying 1ft-4" deep boulders, pit sand. Providing and laying gravel 1ft depth.
CLIENT: BHP PETROLEUM
NAME OF PROJECT AND LOCATION
Zam North Rectification Works
PROJECT DESCRIPTION
Work includes: Dewatering, slush remocval, providing and spearding stone / boulders, gravel and pit sand. Road scarifying, leveling and compacting. Providing and fixing pipe culvert single pipe dia 45cmx 12M, pipe culvert three pipes dia 45cmx12M. Repair construction of parapet walls of the existing culverts located at different locations.
Zamzama North and East FP Pund: Repair of breaking secetion of wall damaged due to flood. Construction of new bricks masonry wall. Filling silt/clay in bottom of bettar protection where flood has eroded section of FP Bund. Hand compacting newly filled material in bottom of bettar protection. Filling cuts, voids, cracks on the inside slope of the bund. Manually compacting newly spread material on top of the bund. Chipping off concrete to clear cracks in bettar protection, filling cracks with cement-sand mortar ratio 1:3
CLIENT: BHP PETROLEUM
NAME OF PROJECT AND LOCATION
Indus Highway Crossing Repair Work.
PROJECT DESCRIPTION
Work includes: Excavation in natural ground 1'-4" deep, 4' wide and 100ft long. Providing and fixing precast RCC slab. Backfilling with manual compaction on top of precast slab.
CLIENT: FOTCO OIL TERMINAL
NAME OF PROJECT AND LOCATION
CONSTRUCTION OF NEW JETTY (QP2) ON TURNKEY BASIS AT FOTCO OIL TERMINAL
PROJECT DESCRIPTION
• Mobilization of all Equipment and Manpower at site
• Construction and maintenance temporary works / facilities
• Additional Survey, Geophysical, Geotechnical Investigations and Hydrographic Investigation (If required)
• Engineering and Detail Design
• Supply of materials, prepare shop drawings, construction etc
• Test on completion for all Equipments of Oil Terminal
• Test after Completion
• Documentation
• Supply of two (2 nos.) vehicles for Employer / Employer's Representative with all requirements as per specifications
• Demobilization
• Procurement and Supply of Equipment at Site
• Supply of Spares & tools, inspection visits and training (both local and foreign)
CLIENT: BHP PETROLEUM (PAKISTAN) PTY LTD
NAME OF PROJECT AND LOCATION
Pipeline Construction and Tie-In Piping Works for WDW Facilities and Development Works
PROJECT DESCRIPTION
• Fabrication, Installation, Testing & Commissioning of Carbon Steel Pipeline 4"dia (PN100) PSL2 Pipes SMLS, W.T. 8.6mm, API 5LX 52 Sch.80 3LPP externally Coated.
• Supply of steel structure, fabrication, installation/bolting and commissioning
• Factory made Hot Induction Bends 10D
• Trenching as per required depth and compaction of the trench bed by providing sieved sand
• Stringing, welding and 100% NDT
• Supply and installation of heat shrink sleeves for welding joints
• Holiday testing, Lowering, Backfilling compaction and ROW reinstatement
• Commissioning Complete
• CP WORKS: Installation of complete CP system including material, survey, Design Engineering, Testing & Commissioning
• Welding of flanges on both ends of the flow line and tie-in with existing facility piping including hydro testing 4400 psig.
• Installation of pipeline in Zamzama Plant
• Supply and installation of the pipeline insulators, end seals (high strength resin type) for cased crossing
• Laying, termination, Splicing, testing etc of Fibre Optic Cable with accessories
• Hydro testing of flow line as per specification.
CLIENT: BHP PETROLEUM (PAKISTAN) PTY LTD
NAME OF PROJECT AND LOCATION
Underground Services of WDW Facility, Works includes:
• Oily Water Drain Network
• Storm/sewage Water Line
• Pits for Underground Services
• Fire Water System
• Tie-Inside the WDW Area
PROJECT DESCRIPTION
• Excavation, disposal of excess material, bedding with granular material, mixed with coarse sand 33% of the total volume compacted with hand ramming.
• Supply, Fabrication and laying of DN150 Sch. 40, A106 Gr.B pipe & pipe fittings. Covers pre-fabrication and filed installation of pipe spools with fittings including end preparation, cutting, bending, welding, NDT, pressure testing, bolt tightening & pre-commissioning and installation of BHP supplied valves.
• Supply, Fabrication and laying of DN80 Sch. 40, A106 Gr.B pipe & pipe fittings. Covers pre-fabrication and filed installation of pipe spools with fittings including end preparation, cutting, bending, welding, NDT, pressure testing, bolt tightening & pre-commissioning and installation of BHP supplied valves.
• Hydrostatic test of lifting pump discharge piping.
• Tie-In of Oily Water Network with the existing Lily Water Network complete in all respect. Supply of all material, consumables, excavation, welding, inspection, testing, backfilling.
• Supply surface preparation, installation and holiday testing of 150mm wide wrapping tape
• Supply and provision of CP test points in all respect to connecting with existing CP system
• Backfilling with local soil in 200mm loose layers and compacted.
• Building valve pit as per specification
• Provision and laying of RCC thrust slabs
• Provision and laying of Marker tape 150mm wide.
CLIENT: BHP PETROLEUM (PAKISTAN) PTY LTD
NAME OF PROJECT AND LOCATION
Construction Services of 3 Foundations of Produced Water Treatment Package inside WDW Facility
PROJECT DESCRIPTION
• Excavation, disposal of excess material, below 1.5 Meter depth which confine space entry requirements for shoring bracing etc.
• Backfilling including compaction as per specification
• Supply and laying of PCC Concrete (1:4:8) having compressive strength of 10Mpa cylindrical.
• Supply and laying of RCC Concrete (1:4:8) having min. compressive strength of 32Mpa cylindrical.
• Supply and fixing steel reinforcement (deformed) of Grade 60 with yield strength of 416Mpa as per specification.
• Supply and fixing M24 anchor bolts (J type) ABS4 hot dip galvanized
• Grating cover for oily and storm water pits.
• Supply, Fabrication and installation of pipe DN80 steel Sch.40.
• Supply, Fabrication and installation of pipe DN200 steel Sch.40
• Chemical resistant/anti Acid tiles for chemical leakage pits.
• Fabrication and installation of SOB as per drawing and specification
CLIENT: PAK ARAB PIPELINE COMPANY LTD (PAPCO)
NAME OF PROJECT AND LOCATION
Construction of 26" x 0.406" White Oil Pipeline Horizontal Directional Drilling (HDD) at Begari Canal, Shahi-Patfeeder and NW Canal at Kashmor Kandh Kot and ShikarPur
PROJECT DESCRIPTION
• Detail topographic survey canal bed profile for preparation of HDD profile and location of tie-in points.
• Loading, transportation/shifting and unloading of all materials supplied by PAPCO
• Excavation for adjustment to tie-in activity in any kind of strata including dewatering by well points, fixing of scaffolding shuttering where required.
• Welding of 26" diameter x 10.3mm w.t. Grade API5LX 65/9.5mm w.t. Grade API5LX 70 line pipe, bends according to API-1104 with qualified welding procedure and welders.
• Hydrostatic testing of pre-fabricated spools with sweet water at 78 bars. All materials, fittings, pumps, dead weight tester.
• Priming and coating of welded joints with heat shrink sleeves including tie-in joints, bends, pipe and fittings repairing of hot spots which occurred during shifting of coated pipe from PAPCO's station.
• Cold cutting of existing 26" dia pipe line for tie-in with new line.
• Oil retrieval / collection from the pipeline segment.
• Final tie-in welding with existing underground oil pipeline at both sides of crossing.
• Removal / dismantling of cut pipe spools from the excavated pit and over pile.
• Removal /dismantling of RCC piles with casing upto 1m deep from bed of canal and caps of existing over head crossing including disposal of concrete and debris.
• Horizontal Directional Drilling (HDD) including excavation for setting of HDD machine, drilling a small dia pilot hole along a designed directional path to the required depth.
CLIENT: FAUJI FERTILIZER COMPANY LTD (FFCL)
NAME OF PROJECT AND LOCATION
Laying of Natural Gas Pipeline from D/S of Mari Gas Field Manifolds to FFC NG Line Compressor Station at Deh Shahbazpur, Daharki
PROJECT DESCRIPTION
• Procurement and supply of Steel Pipeline 20" & 24"dia HFW-HFI-longitudinally welded.
• W.T. 14.27 & 12.70 mm, API 5L 45TH PSL2 Grade X52N 3LPE Coated.
• Preparation of ROW.
• Fabrication, Installation and commissioning of 24" & 20" dia line pipe.
• Trenching as per required depth and compaction of the trench bed by providing sieved sand.
• Stringing, welding and 100% NDT
• Supply and installation of heat shrink sleeves for welding joints
• Holiday testing, Lowering, Backfilling compaction and ROW reinstatement
CP WORKS:
• Installation of complete CP system including material, survey, Design Engineering, Testing & Commissioning.
• Welding of flanges on both ends of the flow line and tie-in with existing facility piping.
• Supply and installation of the pipeline insulators, end seals & casings
• Pigging activity
• Commissioning Complete
• Hydro testing of flow line as per specification.
CLIENT: HASCOL PETROLEUM COMPANY LTD
NAME OF PROJECT AND LOCATION
Laying of 8" x 135M Oil Pipeline under Road Crossings through HDD Method at Shikarpur
PROJECT DESCRIPTION
• Horizontal Directional Drilling under road crossing 8" x 135M under road crossing.
• Pipeline shifting to location.
• welding & testing 100% NDT
• Horizontal Directional Drilling Activity in PARCO premises for connecting the pipeline with Hascol Installation at Shikarpur.
CLIENT: HASCOL PETROLEUM COMPANY LTD
NAME OF PROJECT AND LOCATION
Laying of 10" x 166M Oil Pipeline under Road Crossings through HDD Method at Machike Installation, Shaikhupura
PROJECT DESCRIPTION
• Horizontal Directional Drilling under road crossing 10" x 166M under road crossing.
• Pipeline shifting to location.
• welding & testing 100% NDT
• Horizontal Directional Drilling Activity in PARCO premises for connecting the pipeline with Hascol Installation at Shikarpur.
CLIENT: RAJPUT ENTERPRIZE
NAME OF PROJECT AND LOCATION
Laying of 4" x 233M Pipeline under Road Crossings through HDD Method at Khaskheli and Misri South at Badin Concession Area
PROJECT DESCRIPTION
• Horizontal Directional Drilling under road crossing 4" x 233M under road crossing.
• Pipeline shifting to location. Welding & testing 100% NDT
• Horizontal Directional Drilling Activity in PARCO premises for connecting the pipeline at Khaskheli and Misri South Concession Area.
CLIENT: PAKISTAN REFINERY LTD
NAME OF PROJECT AND LOCATION
Re-routing of JP-1, 6" x 72 Meters Line at Shahrah-e- Faisal, Karachi
PROJECT DESCRIPTION
• Loading/unloading of 3P coated pipe from PRL premises, transportation and unloading at site in accordance with greed procedures and recommended Practices. Pipe Dia. 6" Sch. 40.
• Preparation of test pits to identify the exact location and depth of pipeline at both of tie in points.
• Hot tapping of existing JP-1 line and subsequent tie in to new re-rouuted section near FALAKNAz ARCADE II to RAFEE STAR. The Contractor shall be responsible for the supply all interconnecting fittings required for the execution of Hot tapping. All supplied material shall be compatible with pipe line material.
• Cold cutting/degassing of pipeline and disposal of pipeline product at safe location as per site.
• Laying of Dia 6" 3P coated pipeline as per specifications and relevant drawings, complete in all respects.
• Cleaning, Hydrostatic testing, dewatering and drying of pipeline Dia. 6" Sch.40 as per relevant specification.
• Application of heat shrinkable sleeves of 12" width on welds joints/factory/field bends as per sepcification, relevant drawings and as per manufacturer's recommendations. Dia. 6".
• Re-routing of pipeline interfacing Elec. cables, Water line/Sewerage line with the depth of cover 2 m based on existing level as per specification.
• Supply of all material, fabrications and installation of pipeline marker at every 25m.
CLIENT: IBRAHIM FIBRE LIMITED
NAME OF PROJECT AND LOCATION
HDD Boring and Pulling of 12" M.S. Pipe (8 Nos, 65M each) including on 8" PVC Pipe insertion at Shaikhupura, Faisalabad
PROJECT DESCRIPTION
• Horizontal Directional Drilling 12" x 520M under road crossing.
• Pipeline shifting to location. Welding & testing 100% NDT
• Horizontal Directional Drilling Activity at Ibrahim Fibre Limited Faisalabad.
CLIENT: UNITED ENERGY PAKISTAN LTD
NAME OF PROJECT AND LOCATION
Bijoro - 2 4.5" x 2 Km CS Flow Line from Bijoro 2 to NW-01 and 4 1/2" x 5KM HDPE Line from Naimat Facility to Bijoro 2 and Bijoro - 01
PROJECT DESCRIPTION
• Provide and laying of Re-enforced cement concrete 1:2:4 for pipe support foundations, deck slabs etc.
• Heat Shrink Sleeves (120QC) installation on welded joints 4", Min. 18 sleeves.
• Anchor Sleeve, Fabrication, welding & installation of full encircling sleeves and anchor plates gussets for 4" nominal pipe size.
• Pipe laying 4.5" OD upto Sch.80, upto 500ft
• Pipe laying 4.5" OD upto Sch.80, upto 501 - 5000feet
• HDD in accordance of vendors recommended procedure and Company relevant procedure
• Fabrication and installation of concrete cathodic test post
• Construction and installation of marker posts
• Welding of mechanical fittings (threadolet, weldolet, sockolet or instrument fittings thermowell etc.
• Piping and fittings, threaded from 1/2" - 2" nominal pipe line. Fabrication & erection providing PTFE, sealing tapes & threaded sealant with thread making min. no of flange.
• Fabrication, welding & erection of steel structure, pipe supports, U-bolts/clamps, drill hole etc.
• Painting of epoxy paint, for 275 DFT of steel structure
• Sand blasting with silica sand of piping conforming to SA2-12 standards
• HDPE pipeline laying including transportation, handling, trench, excavation, backfilling and tie-in activities.
CLIENT: UNITED ENERGY PAKISTAN LTD
NAME OF PROJECT AND LOCATION
Bijoro - 3, 4.5" x 5 KM CS Flow Line
PROJECT DESCRIPTION
• Provide and laying of Re-enforced cement concrete 1:2:4 for pipe support foundations, deck slabs etc.
• Heat Shrink Sleeves (120QC) installation on welded joints 4", Min. 18 sleeves.
• Anchor Sleeve, Fabrication, welding & installation of full encircling sleeves and anchor plates gussets for 4" nominal pipe size.
• Pipe laying 4.5" OD upto Sch.80, upto 500ft
• Pipe laying 4.5" OD upto Sch.80, upto 501 - 5000feet
• HDD in accordance of vendors recommended procedure and Company relevant procedure
• Fabrication and installation of concrete cathodic test post
• Construction and installation of marker posts
• Welding of mechanical fittings (threadolet, weldolet, sockolet or instrument fittings thermowell etc.
• Piping and fittings, threaded from 1/2" - 2" nominal pipe line. Fabrication & erection providing PTFE, sealing tapes & threaded sealant with thread making min. no of flange.
• Fabrication, welding & erection of steel structure, pipe supports, U-bolts/clamps, drill hole etc.
• Painting of epoxy paint, for 275 DFT of steel structure
• Sand blasting with silica sand of piping conforming to SA2-12 standards
• HDPE pipeline laying including transportation, handling, trench, excavation, backfilling and tie-in activities.
CLIENT: UNITED ENERGY PAKISTAN LTD
NAME OF PROJECT AND LOCATION
Bijoro - 3, 4.5" x 5 KM CS Flow Line
PROJECT DESCRIPTION
• Manual Excavation & backfilling layer by layer hard/compacted oil with fence.
• Mechanical Excavation & backfilling normal/soft soil strata (shoring, slopping/benching/stepping .
• Provide and laying of Re-enforced cement concrete 1:2:4 for pipe support foundations, deck slabs etc.
• Anchor Sleeve, Fabrication, welding & installation of full encircling sleeves and anchor plates gussets for 6" nominal pipe size.
• Pipe laying 6" OD upto Sch.80, upto 501 - 5000feet
• HDD in accordance of vendors recommended procedure and Company relevant procedure
• Fabrication and installation of concrete cathodic test post
• Construction and installation of marker posts
• Welding of mechanical fittings (threadolet, weldolet, sockolet or instrument fittings thermowell etc.
• Piping and fittings, threaded from 1/2" - 2" nominal pipe line. Fabrication & erection providing PTFE, sealing tapes & threaded sealant with thread making min. no of flange.
• Fabrication, welding & erection of steel structure, pipe supports, U-bolts/clamps, drill hole etc.
• Painting of epoxy paint, for 275 DFT of steel structure
• Sand blasting with silica sand of piping conforming to SA2-12 standards
• HDPE pipeline laying including transportation, handling, trench, excavation, backfilling and tie-in activities.
• Heat Shrink Sleeves (PPS120) installation on welded joints 6", Min. 18 sleeves.
CLIENT: UNITED ENERGY PAKISTAN LTD
NAME OF PROJECT AND LOCATION
NAIMAT KAUSAR - 10" x 3 KM CS FLOW LINE FROM NAKA TO NAIMAT BASAL
PROJECT DESCRIPTION
• Provide and laying of Re-enforced cement concrete 1:2:4 for pipe support foundations, deck slabs etc.
• Anchor Sleeve, Fabrication, welding & installation of full encircling sleeves and anchor plates gussets for 10" nominal pipe size.
• Pipe laying 10" OD upto Sch.80, upto 501 - 5000feet
• Pipeline laying 4.5" OD upto Sch.80 above 5000 feet
• HDD in accordance of vendors recommended procedure, conforming to ASME 31.8/31.4 standards
• Fabrication and installation of concrete cathodic test post
• Welding of mechanical fittings (threadolet, weldolet, sockolet or instrument fittings thermowell etc.
• Piping and fittings, threaded from 1/2" - 2" nominal pipe line. Fabrication & erection providing PTFE, sealing tapes & threaded sealant with thread making min. no of flange.
• Fabrication, welding & erection of steel structure, pipe supports, U-bolts/clamps, drill hole etc.
• Sand blasting with silica sand of piping conforming to SA2-12 standards
• HDPE pipeline laying including transportation, handling, trench, excavation, backfilling and tie-in activities.
• Field bending fabrication of pipe size 10" - 12", bend ranging from 10 degree to 90 degree min.
CLIENT: UNITED ENERGY PAKISTAN LTD
NAME OF PROJECT AND LOCATION
LAYING OF 16" x 15KM NAIMAT POD SALES GAS LOOP LINE PROJECT
PROJECT DESCRIPTION
• HDD Crossing ( 16" line pipe) of black top roads, major water course, canals etc., works includes; preparation ROW, Stringing, Welding, Radiography, Heat Shrink Sleeves and Reinstatement of ROW
CLIENT: UNITED ENERGY PAKISTAN LTD
NAME OF PROJECT AND LOCATION
SOHRAB DEEP - 1, 6" x 5KM FLOW LINE
PROJECT DESCRIPTION
• Manual Excavation & backfilling layer by layer hard/compacted oil with fence.
• Mechanical Excavation & backfilling normal/soft soil strata (shoring, slopping/benching/stepping .
• Provide and laying of Re-enforced cement concrete 1:2:4 for pipe support foundations, deck slabs etc.
• Heat Shrink Sleeves (120OC) Installation on weld joints 6" Min. 15 sleeves.
• Anchor Sleeve, Fabrication, welding & installation of full encircling sleeves and anchor plates gussets for 6" nominal pipe size.
• Pipe laying 6".625" OD upto Sch.80, upto 501 - 5000feet
• HDD in accordance of vendors recommended procedure and Company relevant procedure
• Fabrication and installation of concrete cathodic test post
• Construction and installation of marker posts
• Welding of mechanical fittings (threadolet, weldolet, sockolet or instrument fittings thermowell etc.
• Piping and fittings, threaded from 1/2" - 2" nominal pipe line. Fabrication & erection providing PTFE, sealing tapes & threaded sealant with thread making min. no of flange.
• Fabrication, welding & erection of steel structure, pipe supports, U-bolts/clamps, drill hole etc.
• Painting of epoxy paint, for 275 DFT of steel structure
• Sand blasting with silica sand of piping conforming to SA2-12 standards
CLIENT: UNITED ENERGY PAKISTAN LTD
NAME OF PROJECT AND LOCATION
SUMAR DEEP - 2, 6" x 3.9KM FLOW LINE
PROJECT DESCRIPTION
• Provide and laying of Re-enforced cement concrete 1:2:4 for pipe support foundations, deck slabs etc.
• Heat Shrink Sleeves (120OC) Installation on weld joints 6" Min. 15 sleeves.
• Anchor Sleeve, Fabrication, welding & installation of full encircling sleeves and anchor plates gussets for 6" nominal pipe size.
• Pipe laying 6".625" OD upto Sch.80, upto 501 - 5000feet
• HDD in accordance of vendors recommended procedure and Company relevant procedure
• Fabrication and installation of concrete cathodic test post
• Construction and installation of marker posts
• Welding of mechanical fittings (threadolet, weldolet, sockolet or instrument fittings thermowell etc.
• Piping and fittings, threaded from 1/2" - 2" nominal pipe line. Fabrication & erection providing PTFE, sealing tapes & threaded sealant with thread
• making min. no of flange.
• Fabrication, welding & erection of steel structure, pipe supports, U-bolts/clamps, drill hole etc.
• Painting of epoxy paint, for 275 DFT of steel structure
• Sand blasting with silica sand of piping conforming to SA2-12 standards.
• Field Bending, Fabrication of pipe size 6" - 8", bend ranging from 10 degree to 90 degree.
CLIENT: UNITED ENERGY PAKISTAN LTD
NAME OF PROJECT AND LOCATION
RE-ROUTING OF NAIMAT BASAL - 2, 6" x 5KM FLOW LINE
PROJECT DESCRIPTION
• Laying of 6" Line pipe, (6.625" OD, 0.375w.t. X46, Seamless, 3LPP Coated) underground Flow line including ROW preparation, Stringing, Welding, NDT, providing and installation Heat Shrink Sleeve, Trenching, Lowering, Holiday Testing, Backfilling, Crowning, Reinstatement of ROW, Hydrotesting (including filling/decanting and supply of water). Crossing underground utilities inside and outside facilities.
• Excavation (Mechanical/Manual) to expose existing 6" Naimat Basal - 02
• Removal of 6", 40ft pipe segment from trench incl. cutting, cleaning, removal of HSS, Beveling, transportation and offloading.
• Field Bending, Fabrication of pipe size 6", bend ranging from 10 degree to 90 degree.
• Construction and installation of marker posts
• Open Ditch crossings (Roads, water course, existing pipeline etc) including preparation of ROW, Stringing, Welding, Radiography, installation of Heat Shrink Sleeve and reinstatement of ROW.
CLIENT: UNITED ENERGY PAKISTAN LTD
NAME OF PROJECT AND LOCATION
LAYING OF 8" x 2KM SOHRAB DEEP - 3 TO SOHRAB DEEP - 2 FLOW LINE
PROJECT DESCRIPTION
• Provide and laying of Re-enforced cement concrete 1:2:4 for pipe support foundations, deck slabs etc.
• Heat Shrink Sleeves (120OC) Installation on weld joints 6" Min. 12 sleeves.
• Anchor Sleeve, Fabrication, welding & installation of full encircling sleeves and anchor plates gussets for 8" nominal pipe size.
• Pipe laying 8".625" OD upto Sch.80, upto 501 - 5000feet
• HDD in accordance of vendors recommended procedure and Company relevant procedure
• Fabrication and installation of concrete cathodic test post
• Construction and installation of marker posts
• Welding of mechanical fittings upto 1" (threadolet, weldolet, sockolet or instrument fittings thermowell etc.
• Piping and fittings, threaded from 1/2" - 2" nominal pipe line. Fabrication & erection providing PTFE, sealing tapes & threaded sealant with thread making min. no of flange.
• Fabrication, welding & erection of steel structure, pipe supports, U-bolts/clamps, drill hole etc.
• Painting of epoxy paint, for 275 DFT of steel structure
• Sand blasting with silica sand of piping conforming to SA2-12 standards.
• Field Bending, Fabrication of pipe size 6" - 8", bend ranging from 10 degree to 90 degree.
CLIENT: CHEVRON PAKISTAN LTD
NAME OF PROJECT AND LOCATION
AREA SWEEPING USING PIPE/CABLE LOCATOR
PROJECT DESCRIPTION
• Underground scanning approx 2000 SQM upto a depth of 10ft inclusive of provision of pipe locator, vehicle, survey instruments and personnel
• Marking of identified locations (for pipes, cables) on plot plan with reference to available bench marks including pegging of the location.
• Preparation of reports giving the results of the study, outlining the methodology and details of equipment used.
EXECUTED PROJECTS
CLIENT |
DESCRIPTION |
LENGTH |
YEAR |
|
ENI PAKISTAN LIMITED |
Construction of Pipeline Laying and Associated Works |
|
|
more |
BHP PETROLEUM |
Provision of laying 8" x 20KM 22% Crumium Duplex Stainless Steel Pipeline |
|
|
more |
BHP PETROLEUM |
Provision of laying Super Duplex 13% Crumium Special Steel Pipe 10" x 5.6KM |
|
|
more |
FOUNDATION POWER COMPANY |
20" Dia Gas Pipeline for 175 MW Combined Cycle Power Plant |
|
|
more |
NIGERIAN GAS |
Re-Construction of Burnt Delta IV Metering Station |
|
|
more |
CLIENT: PAK-ARAB |
16" dia MFM Pipeline Crossing by HDD Method |
|
|
more |
SSGC |
Installation of 16" & 20" diameter Submerged high pressure gas pipeline |
|
|
more |
ENGRO FERTILIZERS LIMITED |
14" CROSS COUNTRY PIPING FROM D2 TO E1 POND AT DAHARKI |
|
|
more |
Expansion of Waste Water System |
Provision of Construction of Evaporation Ponds (Expansion of Waste Water System) including the following activities |
|
|
more |
Provision of Zam |
Provision of Zam - 1 Rehabilitation Work |
|
|
more |
Zam North Rectification Works |
Work includes: Dewatering, slush remocval, providing and spearding stone / boulders, gravel and pit sand. Road scarifying, leveling and compacting |
|
|
more |
Indus Highway Crossing Repair Work |
Zamzama North and East FP Pund: Repair of breaking secetion of wall damaged due to flood. Construction of new bricks masonry wall. |
|
|
more |
CONSTRUCTION OF NEW JETTY |
CONSTRUCTION OF NEW JETTY (QP2) ON TURNKEY BASIS AT FOTCO OIL TERMINAL |
|
|
more |
ENI Pakistan Limited |
Construction of 10" dia pipeline laying and associated works for 3 years at Kadanwari, Bhit, Badhra and any other block on call-out basis |
|
|
more |
BHP Petroleum (Pakistan) Pty. Ltd. |
Provision of Construction of Evaporation Ponds (Effluent waste Water System) |
|
|
more |
BHP Petroleum (Pakistan) Pty. Ltd. |
Provision of Zam - 1 Rehabilitation Work of access road. |
|
|
more |
BHP Petroleum (Pakistan) Pty. Ltd. |
Zam North Rectification Works. |
|
|
more |
BHP Petroleum (Pakistan) Pty. Ltd. |
Indus Highway Pipeline Crossing Protective Works |
|
|
more |
ENGRO Fertilizers Ltd. |
Construction of New 16" Dia Gas Line from Engro Fertilizers Ltd Plant site to Mari Gas Manifold-II |
|
|
more |
ENGRO Fertilizers Ltd. |
Construction of 14" Effluent Piping from D2 to E1 Pond |
|
|
more |
Fotco Oil Terminal for Fauji Oil Terminal & Distribution Co. Ltd. |
Construction of New Jetty (QP2) on Turnkey basis at Fotco Oil Terminal for Fauji Oil Terminal & Distribution Co. Ltd. |
|
|
more |
PARCO |
Inspection Services for Coating and Wrapping of 16" Ø Crude Oil Pipeline at Mahmood Kot. |
11 Km |
1981 |
|
|
Hydrostatic Testing 16" Ø Oil P/L 203-258 Km (Mancher Lake to Phulji). |
55 Km |
1981 |
|
|
Water Filling & Hydrostatic Testing (2,100psi) of 16" Ø Crude/Oil P/L. |
50 Km |
1981 |
|
|
Excavation of Trench for 16" Ø Oil Pipeline in all kinds of Soil, Rock blasting Karachi to Dadu Section. |
100 Km |
1981 |
|
|
Transfer Oil Pipeline 20" Ø - 7.8 Km. Keamari to Korangi. |
7.8 Km |
1982 |
|
SNGPL |
16" Ø cross country U/G Gas Transmission P/L upto Sargodha. |
60 Km |
1983 |
|
SGTC |
18" Ø Gas Pipeline 412 Meter long under ground and partial O/H across 2 Nalas over 8 Piles near Sui Field. |
412 Meter |
1997 |
|
WAPDA |
20" Ø Transmission High Pressure cross country under ground Gas Pipeline Mari-Guddu-Kandhkot including crossings. |
60 Km |
1986 |
|
AKUH |
Replacement of 8" Ø Main Gas P/L. Hot Tapping for bye-pass line. |
800 Meter |
1989 |
|
ENGRO |
Const. of 12" Ø Feed Gas P/L from Minifold to Plant at Well # 6. |
11.4 Km |
1993 |
|
MGCL |
Dist. Gas P/L 1" Ø to 3" Ø long in Staff Housing Colony, Daharki. |
13.5 Km |
1993 |
|
|
Gas Gathering Pipeline 20", 16", 10", 8" & 6" Ø in Mari Gas Field. |
48.3 Km |
1993 |
|
OGDC |
Gas Gathering P/L 30",26",14",10" & 8" Ø in Qadirpur Gas Field. |
30 Km |
1996 |
|
FFC |
Pigging of 16" Ø Gas Pipeline Plant to Off-Take. |
50 Km |
1996 |
|
|
Pigging of 14" Ø Gas Pipeline. |
49 Km |
1997 |
|
|
Re-routing of 16" dia Natural Gas Pipeline at Rainee Canal Crossing |
27 Km |
2007 |
|
|
Re-routing of dia 14" Natural Gas Line at Ranee Canal Crossing. |
|
2006 |
|
SICON |
12" Ø Gas Transmission P/L Qadirpur-Liberty Power Plant Daharki. |
30 Km |
1998 |
|
FOTCO |
Construction of White Oil handling facility at FOTCO existing jetty, Port Bin Qasim, Karachi. |
4 Km |
2001 |
|
GNL/S&R |
EPC Project 14", 8", 6", 4" & 3"Ø Gas Pipeline Distributino to Ikeja Industrial Consumers, Ikeja - Nigeria |
10 Km |
2001 |
|
|
EPC Project 6", 4" & 3"Ø Ikeja 1A Extension, Ikeja - Nigeria |
26 Km |
2002 |
|
PRL |
Re-routing of 6"Ø Jet A-1 Pipeline |
7.6 Km |
2001 |
|
UTP/BP |
8" Ø Gas Pipeline 16,000 ft. Dhabi North to Mazari Main Field. |
4.9 Km |
1998 |
|
|
6" Ø Pipeline 46,000 ft. from Makhdumpur to Turk Facility. |
14 Km |
1999 |
|
|
Const. of 8"Ø flowline from Sonro-01 to Mazari Facility |
7000 ft. |
2002 |
|
|
Const. of 4"Ø flowline from Sonro-03 to Sonro Remote Facility |
3000 ft. |
2002 |
|
|
Const. of 4"Ø trunkline from Sonro-6 to Sonro Remote Facility |
3500 ft. |
2002 |
|
PPL |
10" dia factory coated line pipe replacement section of aboveground GGM with buried pipeline at Kandhkot for PPL |
3100 M |
2007 |
|
|
WATER PIPELINE (200 KM) |
|
|
|
KDA |
Construction of 66" Ø Twin steel pipe rising Main (100 mgd) including Fabrication of pipe. |
2 Km |
1981 |
|
EXXON |
Laying 6" Ø Water Supply Pipeline at Daharki Plant. |
3 Km |
1981 |
|
WASA |
Laying Ductile Iron Water Pipeline 150 mm to 400 mm Ø 50 Km in Rakhsan Housing Scheme, Quetta. |
50 Km |
1982 |
|
DHA |
Laying M.S. Pipeline 16" to 36" Ø - 800 Meter in S.T.P. |
800 Meter |
1997 |
|
|
Laying Water Supply Transmission and Distribution 6" to 24" Ø M.S. Pipeline and 4" to 12" Ø A.C. Pipeline. |
60 Km |
1993 |
|
|
Refurbisment of 24" dia wate line at malir River Crossing for DHA |
1,600 RM |
2006 |
|
KWSB |
72" Ø M.S. Twin Pipeline alignment and welding Pipri to North East Karachi - 7,540 Meter (Contract W-8). |
7.6 Km |
1993 |
|
OGDC |
8" Ø Water Pipeline laying at Thora Tando Alam. |
29 Km |
1994 |
|
UTP |
Laying Fire Water Pipeline under ground 12" Ø 4,000 Meter. |
4 Km |
1990 |
|
|
Laying 4" Ø SWD Pipeline 16,000 ft. in Badin Oil Field. |
4.9 Km |
1996 |
|
ENGRO |
Water supply network of 6" to 16" Ø Pipeline - 20,000 ft. at Chemical Fertilizer Plant Daharki. |
6.1 Km |
1993 |
|
|
Laying 12" Ø Effluent P/L 11,000 ft. upto Mahiwah Daharki. |
3.35 Km |
1996 |
|
FFC |
Pigging existing 20" Ø Water Pipeline 8 Km at Goth Machi. |
8 Km |
1996 |
|
KSEW |
Cooling Water Pipe 84", 60" & 36"Ø Sandblasting, Coating and Wrapping at Lalpir Power Plant. |
761 Meter |
1996 |
|
SHELL |
Laying 12" Ø Fire Water P/L 2 Km at Machike incl. 4 Hydrants. |
2 Km |
1997 |
|
SHYDO |
Const. of Penstock 820 mm Ø in Tunnel - 2,130 Meter |
2.5 Km |
1998 |
|
EPTL |
Laying 14", 12", 8" & 6" Ø 3 Km Fire Water Line at I.L. Chemical and Storage Tank farm at Port Qasim. |
3 Km |
1999 |
|
|
PIPELINE CROSSINGS ( 15 KM ) |
|
|
|
WAPDA |
Across River Indus GUDDU BARRAGE - 20" Ø Gas P/L Crossing. |
1.5 Km |
1986 |
|
SSGC |
Across River Indus KOTRI BARRAGE - 18" Ø Gas P/L Crossing. |
1.17 Km |
1990 |
|
|
Across River Indus STEEL BRIDGE - Erection of Bridge Steel Structure over Piled peir near Jamshoro. |
750 Meter |
1995 |
|
|
Across River Indus STEEL BRIDGE - 20" Ø Gas P/L Crossing. |
750 Meter |
1995 |
|
|
Across River Indus (Flood Plane Area) Piled Over Head - 20" Ø Gas Pipeline crossing. |
850 Meter |
1995 |
|
PARCO |
Across River Malir O/H on Piles (167 Nos.) - 20" Ø Oil P/L X-ing. |
2.6 Km |
1990 |
|
|
16" dia MFM Pipeline Crossing by HDD Method of Upper Gogera Branch Canal at District Sheikhupura |
|
2007 |
|
KWSB |
Horizontal Boring & Jacking 84" Ø M.S. Twin Casing Pipe for 72" Ø Water Pipeline Crossing under existing Twin Concrete CONDUIT 26' below ground level. |
54 Meter |
1996 |
|
OGDC |
Emergency Work of 26"Ø gas pipeline crossings over Rabi canal at Dera Murad Jamali. |
550 ft. |
2001 |
|
TULLOW |
Rainee and Fakir Wah Canal Crossing at 8" dia SARA Gas Pipeline |
110 M |
2007 |
|
|
MECHANICAL/CIVIL/ELECTRICAL/STRUCTURAL/PIPING WORKS |
|
|
|
|
GAS WELL HEAD CONNECTIONS (44 Well Heads) |
|
|
|
|
Well Head Connections, Manifold/Assemblies, Piping, Fabrication, Installation of Dehydration/Separator/Condensate and other Process Plants incl. Piping, Instrumentation, Metering and Solar Electrical Installation. |
|
|
|
SGTC |
Mechanical and Civil Construction: Fabrication, Erecetion and Piping works including Foundations. |
|
|
|
|
OIL PUMPING (BOOSTING) STN. at Bubak |
|
|
|
PARCO |
Construction of Civil, Mechanical and Electrical works. Piping and Metering. 3 Nos. Vertical Turbine Pumps 9 MGD. Surge Controller anticipator valves. RCC framed structure SHED (33x7x6.5 m), RCC floor slab. Corrugated asbestos sheet roof on steel trusses. Guntry Crane on extended brackets from columns. |
|
1993 |
|
|
W/S DISTRI. PUMPING STN. WW 1, 2, 3, 4 & 5 (5 Stn.) |
|
|
|
DHA |
Fabrication, Erection and Piping work 8" to 12" Ø pipes at WW 1 to WW 5 incl. Manifolds, Intake & offtake, Foundation and supports. Installation of Pumps, Turbine type Valves, Water Meter and Electrical installation and Electrical Panel Boards etc. and Commissioning. Repair of Pump House, valve chambers etc. |
|
1989 |
|
|
W/S BOOSTING PUMP STN. at Chakra Goth |
|
|
|
|
MECHANICAL/CIVIL/ELECTRICAL/STRUCTURAL/PIPING WORKS |
|
|
|
|
GAS WELL HEAD CONNECTIONS (44 Well Heads) |
|
|
|
|
Repair/Modification of RCC framed structure Pump House 20 x 20 m x 5.3 m Floor Slab Walls and Columns, 24" Ø Transmission Pipeline Interconnection. Fabrication Installation of 24" Ø manifold for 3 Turbine Pumps, Inlet and discharge Pipelines. Installation of 3 Nos. Turbine Pumps 2300 GPD along with all piping hookups, 24" Ø Intake and offtake pipeline, valves and other fittings. |
|
1991 |
|
|
DEVELOPMENT IN EXISTING PUMPING SYSTEM |
|
|
|
|
Design, Construct, Piping Interconnections/Mainifold and Other Mechcanical works of distribution Pumping System at WW1, 2, 3, 4 & 5 during 1988 to 1995. |
|
1995 |
|
|
PLANTS/FACILITIES & PIPING ETC. |
|
|
|
PSMC |
Fab./Installation of Steel Structure and Erection of 36' Ø Chimney, 150' high. |
|
1982 |
|
|
PLANTS/FACILITIES & PIPING ETC. |
|
|
|
KESC |
Re-circulation system of 2 Nos. Fuel Oil Storage Tanks at KTPS, Oil Pumps & Piping ½" & 2" Ø 500 ft. Valves, Fittings & Electrical Control Panel etc. |
|
1986 |
|
UTP |
Bukhari Compression Facility Civil work Pile Foundations, Groutings, Grating etc. in Badin Oil/Gas Concession. |
|
1997 |
|
|
Sluge Catcher Twin Pipe 36" Ø 440' long each, Installation, Fabrication, Welding, Sandblasting and Painting at Bukhari and Golarchi Facilities. |
|
1997 1998 |
|
SHELL |
Construction and Testing of In-Plant Piping (3.7 Km) and Equipment installation works at Machike including 12"Ø fire water alarm system with hydrants (2 Km) |
|
1997 |
|
|
MECHANICAL/CIVIL/ELECTRICAL/STRUCTURAL/PIPING WORKS |
|
|
|
|
GAS WELL HEAD CONNECTIONS (44 Well Heads) |
|
|
|
|
SEWERAGE TREATMENT PLANT (2 NOS.) |
|
|
|
DHA |
Design Construct Piping & Other Mechanical works. |
|
1997 |
|
|
Grit Chamber,Primary and Secondary Clarifier, Sludge Digester and Sludge Tank.Sludge Drying Bed.Effluent Tank, Chlorination Station, Aeration Tank, Tanker Filling Station, Sludge Pumps, Effluent Pumps, Installation of other Pumps, Parking and Ancillaries Facilities, All Mechanical inc. Structure & Aerator Supply and installation of Pumps. |
|
|
|
|
OIL STORAGE STEEL TANKS (7 Nos.) |
|
|
|
WAPDA |
Design, Const., Civil, Mechanical,Farbrication/Erection & complete installation At Steam Power Station, Faisalabad. |
|
1984 |
|
|
2 Nos. Oil Storage Tanks (75' Ø 24' high) 2500 Tons each incl. Foundation U/G Decanting RCC tank 60' x 20' x 10', Oil pumps 7500 GPM @ 250 psi. |
|
|
|
|
Three system with steam heating coil and level indicator. |
|
|
|
|
FIRE FIGHTING WATER SYSTEM (4 Locations) |
|
|
|
UTP |
Khaskheli facility 12" Ø P/L 4,000 Meter 18 Nos. Hydrants,Valve, Fire handling etc. |
|
1990 |
|
|
STEEL BRIGDES CONSTRUCTION (6 Nos.) |
|
|
|
SSGC |
Designed modified existing Structure (Members), Fabricated and Installed STEEL STRUCTURE TRUSSES (BOX GARDER) 4,444 ft. on Kotri Barrage structure to hold (elevated) Loops 100' x 24 feet each at 3 Locations for 18" Ø P/L crossing. |
|
1990 |
|
SSGL |
NEW STEEL BRIDGE Across River Indus (near Jamshoro) |
|
|
|
|
Design, Fabricate and Install STEEL STRUCTURE TRUSSES over Pile Peir for 18" Ø Gas Pipeline crossing 750 Meter length. |
|
1996 |
|
|
STEEL BRIGDES CONSTRUCTION (6 Nos.) |
|
|
|
SSGL |
Design, Fabricate STEEL TRUSS BRIDGE laid over piles (28 Meter Span) Across Nala for 18" Ø Hp Gas Pipeline crossing near Sui Field. |
|
1997 |
|
UTP |
Fabrication/Erection STEEL GIRDER BRIDGE over 5 Nos. 70' span (350' long) Across LBOD (Keyhole-01). |
|
1997 |
|
|
CEMENT MORTAR LINING (34 Km) - Cost 10 Million |
|
|
|
KESC |
M.S. Water Pipeline at Port Qasim 12" Ø................................700 Meter |
|
1989 |
|
KWSB |
M.S. Water Pipeline 54" Ø.............................100 ft. |
|
1989 |
|
DHA |
24" Ø M.S. Pipeline..................................12,000 Meter |
|
1989 |
|
|
18" Ø M.S. Pipeline...............................11,800 Meter |
|
1989 |
|
|
12" Ø M.S. Pipeline..........................................5,500 Meter |
|
1989 |
|
|
6" Ø M.S. Pipeline.............................................1,500Meter |
|
1989 |
|
|
6" to 36" Ø M.S. Pipe laid in Sewerage Treatment Plant..800 Meter |
|
1996 |
|
PARCO |
4" to 12" Ø M.S. Pipe liad in Sewerage Treatment Plant.1,600 Meter |
|
1999 |
|
|
CANAL GATES (130 Gate) - Cost 10 Million |
|
|
|
WAPDA |
Rehabilitation/Improvement PAT FEEDER CANAL RD: 177 MILE |
|
1996 |
|
|
New Radial / Vertical Gates 3 x 4 Meter............................8 Gates |
|
|
|
|
Radial Gates Raising 0.6 Meter & repairing...................61 Gates |
|
|
|
|
Vertical Gates Raising 0.6 Meter & repairing.................22 Gates |
|
|
|
PSM |
Sea Water Canal Gate 6m x 12m vertical........................1 Gate |
|
1989 |
|
|
Intake Bulk Head 3m x 6m vertical.........................2 Gates |
|
1981 |
|
KDA |
Water Supply Canal Gate (COD Hill) vertical..................1 Gate |
|
1982 |
|
|
Mulla Channel Gandawa.................................4 Gates |
|
1992 |
|
BMID |
Hub Dam - Channel............................1 Gate |
|
|
|
|
Wuch Mangai Pilot Scheme Canal Gate......................4 Gates |
|
1990 |
|
|
Pelar Perennial Irrigation Scheme Canal Gate ..................4 Gates |
|
1990 |
|
|
Sorh Perennial Irrigation Scheme Channel Gate..........3 Gates |
|
1990 |
|
|
Gachina Perennial Irrigation Scheme Channel Gate..........2 Gates |
|
1992 |
|
SHYDO |
Hydel Project Penstock/Transfer Pipeline Control Gate. 17 Gates |
|
1998 |
|
|
SPLIT SLEEVE WELDING (4,500 ft.) - Cost 6.5 Million |
|
|
|
PARCO |
Fabrication, Installation & Welding of Split Sleeves on 16" Ø P/L RD:(164 - 170). Trench Excavation and Backfilling |
120 ft |
1986 |
|
|
SPLIT SLEEVE WELDING (4,500 ft.) - Cost 6.5 Million |
|
|
|
|
Fabrication, Install and Weld Split Sleeve in section I, II, III and IV from Karachi to Mahmood Kot. |
580 ft. |
1997 |
|
|
Fabrication Installation and Welding Split Sleeve on 16" Ø Main Oil Pipeline from Karachi to Mahmood Kot in Section I to IV. |
268 ft. |
1998 |
|
|
IRRIGATION PROJECTS |
|
|
|
WAPDA |
CANAL CONSTRUCTION CRBC Contract No.60 at D. I. Khan |
|
|
|
|
Construction of Chashma Right Bank Canal RD; 175-210, Capacity at Hd 5,000 cusec, Bed width 40', Top width 100', depth 14', Embankment (Earth Fill) 75,000 cu. yd., Brick Lining 4" thick on side slopes and bed 320,000 sq. yd., Foot-Bridge 2 Nos. |
|
1985 |
|
|
CANAL CONSTRUCTION CRBC Contract No.83 at D. I. Khan |
|
|
|
|
Construction of Chashma Right Bank Canal RD; 000+210, Cross drainage RCC structures, stone pitching 1,500 ft2., Earth filling for embankment 20,000 cu. yd. |
|
1986 |
|
|
|
|
|
|
|
SPLIT SLEEVE WELDING (4,500 ft.) - Cost 6.5 Million |
|
|
|
BMIAD |
WUCH MANGAI PILOT SCHEME at Pishin |
|
|
|
|
Artificial Ground Water Recharge Ponds Scheme designed to divert flood flows from the Wuch Mangai Nullah into a series of Recharge ponds, A gabion bifurcation spillway above the main weir, An 85' stone masonry weir across the Wuch Mangai Nullah with a 44.5' wide off-take and 6' scour sluice, 500' long plain concrete off-take channel, 576' x 175' x 13' high compacted earth storage reservoir with spill channel and bottom outlet, 5,000' long plain concrete and masonry conveyance channel, Three recharge ponds, each 600' x 100' x 8' deep with spillway, Housing for monitoring works, Gates vertical 4 Nos. |
|
1990 |
|
BMIAD |
PELAR PERENNIAL IRRIGATION SCHEME at Khuzdar |
|
|
|
|
Construction of RCC weir 300' long and under sluice 2 Nos. gated 5' span each, RCC intake conduit 3' x 3' gated 1,000' long, Open lined channel 22,200 ft. long, Aqueducts, check and check-cum-draw, check-cum-nuccas, ractangular nuccas and culverts, Gates Vertical 4 Nos. |
|
1990 |
|
|
SORH PERENNIAL IRRIGATION SCHEME at Zhob |
|
|
|
|
River diversion for construction of intake channel 3.25 cusecs-155' long upto well, Constructin of 8' Ø stone masonry sump well 42' deep, Irrigation channel and other tributaries 217,500' long. Earthen channel 86,750' and Lined channel 130,750', Water lifting arrangement by diesel engine driven pump 6" x 5", Canal head regulator, check-cum-scape, check-cum-nuccas, check-cum-drop, pipe chulverts (slab/pipe type) etc., Gates vertical 3 Nos. |
|
1990 |
|
BIMAD |
GACHINA PERENNIAL IRRIGATION SCHEME at Harnai |
|
|
|
|
Rehabilitation of existing weir by repairing bed at U/S and D/S for controlling seepage, Construction of of sluice and in-take channel with proper steel gate arrangements, Lining of channels with 6" thick CC, Construction of Super passages, road culverts, aqueducts and other structures and also a hut for operators, Gates vertical 2 Nos. |
|
1992 |
|
CGC |
PAT FEEDER CANAL IMPROVEMENT PROJECT at D.M.J. |
|
|
|
WAPDA |
Modification/Repair of Canal, Regulators and Gate RD;00-177, Manufacturing Radial/Vertical Gates 64 Nos., Installation, Sandblasting and Painting, Rehabilitation/Repair of Apron works at D/S of regulators, Widening canal bed & dredging about 3' depth by (Beaver-600) Dredger, Sheet Piling, Laying Geotextile Sheets and Placing Stone Filter Bed, Stone Pitching at side slopes, Repair to bed pavements, peirs, wing walls and embeded parts by cement concrete and brick masonry work, Construction of Shed, Compound Walls and complete Workshop with all facilities, Office Block, Residential colony (Quarters and Bungalows), Camp and Mess Buildings, street lighting and colony roads, abulation block, water supply and sewage disposal arrangements. |
|
1996 |
|
NDP |
Linning of Noshera Channel Rehbilitation Sub-Project in District Jhal Magsi, District Baluchistan |
|
2007 |
|
Zamzama Gas |
Provision of laying 8" x 20km Pipeline from Zamzama North Wellhead to Zamzama Gas Processing Plant |
|
2010 |
|
Zamzama Gas |
Provision of laying 10" x 5.6 km Pipeline from Zamzama B&D infill wells to Zamzama Gas Processing Plant |
|
2010 |
|
HASCOL PETROLEUM COMPANY LTD |
Laying of 8" x 135M Oil Pipeline under Road
Crossings through HDD Method at Shikarpur |
135M |
2013 |
more |
HASCOL PETROLEUM COMPANY LTD |
Laying of 10" x 166M Oil Pipeline under Road Crossings through HDD Method at Machike Installation, Shaikhupura |
|
|
more |
RAJPUT ENTERPRIZE |
Laying of 4" x 233M Pipeline under Road Crossings through HDD Method at Khaskheli and Misri South at Badin Concession Area |
|
|
more |
PAKISTAN REFINERY LTD |
Re-routing of JP-1, 6" x 720 Meters Line at Shahrah-e- Faisal, Karachi |
72M |
2013 |
more |
IBRAHIM FIBRE LIMITED |
HDD of 12" M.S. Pipe (8 Nos, 65M each) including on 8" PVC Pipe insertion at Shaikhupura, Faisalabad |
520M |
2013 |
more |
UNITED ENERGY PAKISTAN LTD |
Bijoro - 2 4.5" x 2 Km CS Flow Line from Bijoro 2 to NW-01 and 4 1/2" x 5KM HDPE Line from Naimat Facility to Bijoro 2 and Bijoro - 01 |
|
|
more |
UNITED ENERGY PAKISTAN LTD |
Bijoro - 3, 4.5" x 5 KM CS Flow Line |
5KM |
2013 |
more |
UNITED ENERGY PAKISTAN LTD |
NAIMAT WEST - 3, 6" x 3 KM Flow Line |
|
|
more |
UNITED ENERGY PAKISTAN LTD |
NAIMAT KAUSAR - 10" x 3 KM CS FLOW LINE FROM NAKA TO NAIMAT BASAL |
|
|
more |
UNITED ENERGY PAKISTAN LTD |
LAYING OF 16" x 15KM NAIMAT POD SALES GAS LOOP LINE PROJECT |
|
|
more |
UNITED ENERGY PAKISTAN LTD |
SOHRAB DEEP – 1, 6" x 5KM FLOW LINE |
|
|
more |
UNITED ENERGY PAKISTAN LTD |
SUMAR DEEP – 2, 6” x 3.9KM FLOW LINE |
|
|
more |
UNITED ENERGY PAKISTAN LTD |
RE-ROUTING OF NAIMAT BASAL – 2, 6” x 5KM FLOW LINE |
|
|
more |
UNITED ENERGY PAKISTAN LTD |
LAYING OF 8” x 2KM SOHRAB DEEP – 3 TO SOHRAB DEEP – 2 FLOW LINE |
|
|
more |
CHEVRON PAKISTAN LTD |
AREA SWEEPING USING PIPE/CABLE LOCATOR |
|
|
more |
LARGE DIAMETER HORIZONTAL
DIRECTIONAL DRILLING
Construction contracts - design, labour, equipment and
all technical requirements for installation of up to 24"
dia Steel Pipe x 300M long using Horizontal
Directional Drilling including fabrication
of pipeline crossing with bends & tie-in to existing
systems.
HDD EXPERIENCE
SNo. |
DESCRIPTION OF WORK |
CLIENT |
QTY |
LENGTH |
01 |
Contract #:SSGC/SC/TE-434/Cont-490/2005
Installation of 20" Diameter x 0.438" W.T. Steel Gas Pipeline (API 5L-X60) under Canal by Horizontal Directional Drilling (HDD) at following locations:
1) Pat Feeder Canal (Completed)
2) Frontier Wah (Completed)
3) Naseer Wah (Completed)
4) Shahi Wah (Completed) |
Sui Southern Gas Co. Ltd (SSGCL) |
1
1
1
1 |
220M
100M
120M
156M
|
02 |
Contract #:SSGC/SC/TE-600/Cont-602/2006
Installation of 16” & 20" Diameter x 0.375" & 0.438" W.T. Steel Gas Pipeline (API 5L-X60) under Canal by Horizontal Directional Drilling (HDD) at following locations:
1) Begari Canal Crossing km 70 + 781 (Completed)
2) Rohri Canal Crossing mp 77 + 2100 (Completed)
3) KP East Crossing mp 77 + 2800 (Completed) |
Sui Southern Gas Co. Ltd (SSGCL) |
1
1
1 |
140M
243M
120M |
03 |
Contract #: PL/MANCH/8025/2005
Re-Routing / Byepass of Manchar Lake Segment of 16" Diameter x 0.5" Steel KMK Pipeline (API 5L-X46) at DADU
1) ARAL WAH 1 Crossing by HDD (Completed)
2) ARAL WAH 2 Crossing by HDD (Completed) |
Pak Arab Refinery Company Ltd (PARCO) |
1
1 |
168M
132M |
04 |
Installation of submerged 24"dia x 0.469", 20"dia x 0.438" and 18" dia x 0.406" W.T, API5L Grade X70/ X60 high pressure Steel Gas Pipelines under canals/crossings using HDD method at the following locations (awarded)
1) Nusrat Branch (KM 136 + 188) 24" & 20" ØP/L Actual Qty 84+96=180M (completed)
2) Nara Canal (KM 39 + 57) 24" Ø P/L (Completed)
3) N.W. Canal (KM122 + 917) 20" 18"Ø P/L (Completed)
4) Begari Canal (KM 22 + 161) 18"Ø P/L (Completed) |
Sui Southern Gas Co. Ltd (SSGCL) |
2
1
2
1
|
100+100=200M
360M
160+160=320M
180M |
05 |
Purchase Order #: 508384/55/05
Fateh Shah – 1 to Makhdumpur 4" Dia (Steel Casing)
Jafara Wah Crossing by HDD in Badin Concession Area (Completed) |
British Petroleum
Pakistan Inc. |
1 |
124 Rft |
06 |
Purchase Order #: 508812/F5/05
Polyethylene Pipeline (4" Dia Steel Casing)
Pir Wah Crossing by HDD in Badin Concession Area (Completed) |
British Petroleum
Pakistan Inc. |
1 |
200 Rft |
07 |
Order Reference #: SUN CNG 168/2006
12" Ø Steel Pipeline Crossing by HDD at Mehran Highway, Landhi, Karachi for 8" Ø Gas carrier pipe (Completed) |
SUN CNG Total Petrol Pump |
1 |
65M |
08 |
Ø 6" 0.25" W.T DN 150 Carbon Steel Pipeline (API5L Gr. B) RBOD Crossing at BHP Zamzama Phase – II Project, DADU (Completed) |
BHP/DESCON |
1 |
170M |
09 |
16" Diameter x 0.5" W.T MFM Pipeline (API5LX-46) crossing by HDD method at Upper Gogera Branch Canal, District Sheikhupura, Faisalabad (Completed) |
Pak Arab Refinery Company Ltd (PARCO) |
1 |
120M |
10 |
8" dia gas gathering lines between MD13 – 3 and MD 6 - 9 crossing underneath the Shah Minor Canal using Horizontal Directional Drilling (Completed) |
Mari Gas Co. Ltd |
2 |
500 RFT |
11 |
Nirli Minor Canal crossing using Horizontal Directional Drilling for 20" dia gas pipeline for 175MW, CCPP at Daharki (Completed) |
Foundation Power Company Ltd |
1 |
84 M |
12 |
Crossing of Chandan Wah Canal at Johi Road for 8" 13% Cr. SS Duplex X-65 Gas Pipeline and Fiber Optic Cable/Conduit using Horizontal Directional Drilling System for ZAM – NORTH Pipeline Project (Completed) |
BHP Petroleum (Pakistan) Pty Ltd |
3 |
330M |
13 |
Laying of 16" dia pipeline through HDD Method at Masu Wah Canal (Completed) |
FFC/Amtech |
1 |
75M |
14 |
Laying of 6" dia x 0.28, w.t. API 5LX52 gas pipeline through HDD Method at BP Haider Deep 01 Rohri Canal Matheri (Completed) |
ENGRO Chemical Ltd |
1 |
150M |
15 |
Laying of 16" dia x 0.28, w.t. API 5LX52 gas pipeline through HDD Method at Narli Wah Canal (Completed) |
ENGRO Chemical Ltd |
1 |
150M |
16 |
Laying of 16" dia x 0.28, w.t. API 5LX52gas pipeline through HDD Method at Mehar Sub Drain (Completed) |
ENGRO Chemical Ltd |
1 |
132M |
17 |
Laying of 16" dia gas pipeline through HDD Method at Mari Gas Office Road (Completed) |
ENGRO Chemical Ltd |
1 |
126M |
18 |
Laying of 16" dia x 0.28, w.t. API 5LX52 gas pipeline through HDD Method at Mari Gas Colony Road (Completed) |
ENGRO Chemical Ltd |
1 |
108M |
19 |
Laying of 16" dia x 0.28, w.t. API 5LX52 gas pipeline through HDD Method at Mari Gas Check Post Goth Kallo Buro (Completed) |
ENGRO Chemical Ltd |
1 |
84M |
20 |
Laying of 12" dia 5L Gr.B casing through HDD Method at Sugar Mill Road (Completed) |
Fatima Fertilizer |
1 |
54M |
21 |
Laying of 16" dia x 0.28, w.t. API 5LX52 gas pipeline through HDD Method at Water Course Goth Ismail (In-hand) |
ENGRO Fertilizers Ltd |
1 |
150M |
22 |
Laying of 14" dia water pipeline through HDD Method at Mari Gas Road (In-hand) |
ENGRO Fertilizers Ltd |
1 |
108M |
HDD EXPERIENCE
S. NO. |
DESCRIPTION
OF WORK |
STATUS |
CLIENT |
LENGTH |
COMPLETION DATE |
01 |
Installation of 16” & 20" Diameter x 0.375" W.T. Gas Pipeline under Canal by Horizontal Directional Drilling (HDD) at following locations:
1) Begari Canal Crossing 20" Ø
2) Rohri Canal Crossing 16" Ø
3) KP East Crossing 16” Ø |
Completed
In-hand
Completed |
SSGC |
155M
225M
127M |
04-Jun-07
|
02 |
Ø 6" RBOD Crossing at BHP Zamzama Phase – II Project, DADU |
Completed |
BHP / DESCON |
170M |
23-Feb-07 |
03 |
Installation of 20" Diameter x 0.438" W.T. Gas Pipeline under Canal by Horizontal Directional Drilling (HDD) at following locations:
1) Pat Feeder Canal 20"Ø
2) Frontier Wah 20"Ø
3) Naseer Wah 20" Ø
4) Shahi Wah 20"Ø |
Completed
Completed
Completed
Completed |
SSGC |
222M
108M
120M
156M |
14-Dec-06
|
04 |
Re-Routing / Bypass of Mancher Lake Segment of 16" Diameter KMK Pipeline at DADU
1) ARAL WAH 1 Canal Ø 16"
2) ARAL WAH 2 Canal Ø 16" |
Completed
Completed |
PARCO |
168M
132M |
18-Sep-06
|
05 |
12" Ø Crossing by HDD at Mehran Highway, Landhi, Karachi for 8" Ø Gas carrier pipe |
Completed |
SUN CNG Total Petrol Pump |
65M |
28-Aug-06 |
06 |
Steel Casing (Ø4") for Polyethylene Pipeline
Pir Wah Crossing by HDD in Badin Concession Area |
Completed |
British Petroleum Pakistan Inc. |
200 Rft |
28-Feb-06
|
07 |
Fateh Shah – 1 to Makhdumpur
Jafara Wah Crossing by HDD in Badin Concession Area |
Completed |
British Petroleum Pakistan Inc. |
124 Rft |
25-Feb-0 |
|